November 9, 2026

Major Iron Ore Export Terminal: Marine SI Program

In-service removal of thick hazardous coatings from thousands of m² of wharf steel at a major iron ore export terminal, using RPR induction with nil abrasive, no shutdown and trades working alongside.

November 9, 2026

ExxonMobil Tank T27 GRP Removal

Five crew removed 5 to 16 mm of GRP from a crude oil tank annular at ExxonMobil’s Jurong Island facility in eight days using RPR induction, with MFL floor scanning running alongside.

October 20, 2026

South Walker Creek Coal Mine

ACR Tech used RPR induction to strip 32m² of 3 to 5mm polyurea lining from a CHPP sump tank at South Walker Creek in a single shift, with zero steel damage and no hot work.

October 20, 2026

RG Tanna Coal Terminal

ACR Tech used RPR induction to strip 5,000m² of hazardous coal tar epoxy from wharf headstocks and piles at the Port of Gladstone, up to four times faster than blasting and with zero abrasive media entering the marine environment.

October 20, 2026

Mining Processing Mill

ACR Tech used RPR induction to strip a 30mm vulcanised rubber lining from an MK3000 mill shell in a single shift, with zero steel damage, no open flames and just two technicians.

October 20, 2026

BP Kwinana Energy Hub: Tank 303

ACR Tech used RPR induction to strip hazardous lead-based paint from a live bulk hydrocarbon storage tank at BP Kwinana, WA, with zero sparks, zero airborne lead dust and no scaffold encapsulation.

May 22, 2026

Gabba Stadium – Light Tower

ACR Tech used RPR heat induction technology to remove coatings from the Gabba Stadium Light Tower Gate 9 in Brisbane. The method was chosen for its eco-friendly, silent, and safe process, ideal for this high-profile, heritage-sensitive location.

May 7, 2026

Shell Nederland Chemie – Cation Water Vessel, Moerdijk

RPR GreenTank Induction Disbonder technology was deployed inside Cation Water Vessel V-402B at Shell Nederland Chemie’s Moerdijk facility in the Netherlands, successfully removing a complex multi-layer interior coating system up to 12mm thick with zero kilograms of grit waste produced, in a confined chemical vessel where grit blasting was completely ruled out.

May 7, 2026

Eurotunnel – Railway Wagon Floor Coating Removal, Coquelles

RPR heat induction technology was deployed at the Euro Tunnel workshop in Coquelles, France, to remove Nuansol epoxy adhesive floor coating from railway wagon steel floor panels, reducing stripping time from 4 full days per wagon using sand blasting to just 4.5 hours, a 90% reduction in stripping time across a 3-year maintenance contract.

May 7, 2026

West Venture Drilling Vessel – Deck Coating Removal, Norwegian Sector

RPR heat induction technology was deployed on the West Venture fifth generation semi-submersible drilling vessel in December 2004 to carry out fast, dry, and efficient deck coating removal across 150m2 of safety-critical deck surfaces, completing the full removal and recoating scope in just 6 days and saving an estimated 5 days compared to UHP water jetting.

May 7, 2026

Statoil Troll A Platform – Chartek Fireproofing Removal, Norwegian Offshore

RPR Induction technology was deployed on the Statoil Troll A offshore platform in Norway to remove Chartek intumescent fireproofing from the living quarters module, enabling 24/7 silent operations in an occupied environment where conventional chiselling was restricted to just 6 hours per day.

May 7, 2026

Shell Exploration and Production – Tank Internal Coating Removal, Delfzijl

RPR Induction technology was used to remove internal coatings from storage tanks at Shell Exploration and Production’s Delfzijl facility in the Netherlands, delivering a faster, cleaner, and more cost-effective alternative to sand blasting and UHP water jetting.

 

May 7, 2026

Induction Coating Removal – Wakato Bridge (Japan)

RPR Induction Coating Removal was deployed on a large bridge structure in Japan, addressing one of the most demanding coating removal challenges in a harsh marine environment. The project involved 5,000 m2 of existing thick coatings containing hazardous substances. RPR’s induction technology enabled full coating removal across the entire bridge structure, completing the work on an accelerated program with nil abrasive used and no traffic interruption throughout the project duration.

April 20, 2026

Removal of 3 Coat Polyethylene

Removal of Polyethylene coating from 4 x 11m pipelines in Perth, Western Australia. Approximately 28m² per pipe section.

April 16, 2026

RG Tanna Coal Terminal

Removal of Coal Tar Epoxy coating from headstocks and piles at the RG Tanna Coal Terminal, Gladstone. Coating thickness 1000–3000 microns.

April 16, 2026

Isaac Plain Sump Refurbishment

During a scheduled shutdown at Isaac Plains Coal Mine, IMATECH contracted ACR Technologies to remove existing Polyurea coating from 7 sumps using induction disbonding technology over a 10-day period.

March 13, 2026

Savage River
Suspended Pipeline

ACR Technologies was contracted by Duratec to remove lead-based coating from a 300m suspended pipeline at Savage River, Tasmania, using RPR induction disbonding technology without the use of abrasive or water blasting.

 

Explore innovation, technology and news from our journey

Explore the latest innovations, project stories, and insights from the ACR Tech team.

October 28, 2026

Planning a Blast and Paint Project in Queensland: How Induction Coating Removal Cuts Blast Time and Waste

October 26, 2026

Induction Coating Removal Costs in Australia: What Drives the Price per Square Metre on Steel Assets

September 28, 2026

Planning a Lead Paint Removal Project in Australia: Compliance, Licensing and Site Setup