Major Iron Ore Export Terminal: Marine SI Program

Results

“Their approach allows other work groups to work in close proximity and reduces logistical requirements in what is an extremely complex work area on the [wharf].” Ben Curnick, Project Manager, Marine SI Project, Monadelphous
Of wharf steel
0 + m²
Program in service
0 + yrs
Abrasive media used
0

Solution

RPR induction removes thick hazardous coatings with nil abrasive, so suspended scaffold isn't loaded with garnet.

Lower dust means rope access crews, boilermakers and painters keep working the same deck.

Project Overview

A major iron ore export terminal in the Pilbara is being remediated in service under a Marine Structural Integrity Program. Its steel sits over water, under and beside live conveyors, in Pilbara heat.

  • Location: Pilbara, WA
  • Asset: working iron ore export wharf
  • Scope: thousands of m² of wharf steel with bulk hazardous coatings
  • Program: 2+ years, remediated in service with no shutdown
  • Access: suspended scaffold over water on a shared, confined deck
  • Problem with blasting: abrasive blasting loads suspended scaffold with garnet, fills the deck with dust and clears every other trade out

Services Included

ACR Tech removes the thick hazardous coatings with RPR induction instead of abrasive blasting.

  • RPR induction removal of bulk hazardous coatings
  • Nil abrasive, so no garnet loading on suspended scaffold
  • Low-dust removal on a shared, confined deck
  • Works coordinated so rope access crews, boilermakers and painters keep working the same deck
  • Ongoing support for structural integrity remediation in service

Conclusion

RPR induction is helping keep a complex, live export wharf in service while thousands of m² of hazardous coatings come off, without blasting clearing the deck.

  • Accelerated program
  • Improved hazardous coating management
  • Increased project productivity
  • Reduced operational risk
  • Lower dust, with trades working alongside

Project Overview

Mid-2025, ongoing

A major iron ore export terminal in the Pilbara is being remediated in service under a Marine Structural Integrity Program. Its steel sits over water, under and beside live conveyors, in Pilbara heat.

  • Location: Pilbara, WA
  • Asset: working iron ore export wharf
  • Scope: thousands of m² of wharf steel with bulk hazardous coatings
  • Program: 2+ years, remediated in service with no shutdown
  • Access: suspended scaffold over water on a shared, confined deck
  • Problem with blasting: abrasive blasting loads suspended scaffold with garnet, fills the deck with dust and clears every other trade out

Services Included

ACR Tech removes the thick hazardous coatings with RPR induction instead of abrasive blasting.

  • RPR induction removal of bulk hazardous coatings
  • Nil abrasive, so no garnet loading on suspended scaffold
  • Low-dust removal on a shared, confined deck
  • Works coordinated so rope access crews, boilermakers and painters keep working the same deck
  • Ongoing support for structural integrity remediation in service

Conclusion

RPR induction is helping keep a complex, live export wharf in service while thousands of m² of hazardous coatings come off, without blasting clearing the deck.

  • Accelerated program
  • Improved hazardous coating management
  • Increased project productivity
  • Reduced operational risk
  • Lower dust, with trades working alongside