South Walker Creek Coal Mine

Results

32m² of heavy polyurea lining stripped in a single shift, leaving clean, undamaged steel ready for inspection and relining.
m² of polyurea stripped in one shift
0
Substrate damage or gouging
0
Hot work permits required
0

Solution

RPR induction broke the polyurea bond at the steel face, letting technicians peel the lining away in large, intact sheets.

A two-person crew completed the full scope in one 10-hour shift, keeping the sump tank well ahead of the shutdown schedule.

Project Overview

During a planned statutory maintenance shutdown at the South Walker Creek open-cut coal mine in the Bowen Basin, Central QLD, asset operators needed to remediate a primary CHPP sump tank. The existing 3 to 5mm polyurea lining had reached the end of its service life, with localised delamination exposing the steel to aggressive slurry abrasion and chemical attack.

Complete removal was mandatory before NDT structural inspections and relining could take place, all within a tightly constrained shutdown window.

  • Manual pneumatic chiselling, gouging and grinding pose severe Hand-Arm Vibration Syndrome (HAVS) risks and create sharp flying debris in confined plant spaces
  • Open gas torches generate toxic isocyanate fumes and carbon monoxide, triggering hot work constraints and heavy respiratory controls
  • Mechanical chipping scores and gouges the parent steel, creating stress concentrations and requiring secondary grinding
  • UHP water jetting would have generated large volumes of slurry waste, disrupted adjacent maintenance fronts and caused flash rusting
  • Principal contractor Imatech needed a rapid, non-destructive method that would not delay the shutdown or compromise worker safety

Services Included

  • RPR induction lining removal
  • Removal of 3 to 5mm elastomeric polyurea
  • Self-contained mobile RPR unit
  • Two-person specialist technician crew
  • Non-destructive, flame-free removal with no hot work permits
  • Waste capture using ground drop sheets
  • Surface preparation leaving clean steel ready for NDT and relining

Conclusion

RPR induction delivered a cleaner, safer and commercially superior outcome at South Walker Creek, returning the sump tank to Imatech well ahead of the critical shutdown path.

  • The entire 32m² internal geometry stripped in a single 10-hour shift, eliminating several days of mechanical chipping
  • Polyurea lifted away in large, pliable sheets using hand scrapers, with no cutting, burning or grinding
  • Steel left bare, unwarped and free of tool marks, with the original surface profile fully preserved
  • Inspectors could immediately carry out ultrasonic thickness testing and magnetic particle inspections
  • 100 per cent of waste captured on drop sheets, reducing clean-up and disposal handling
  • No dust, vibration or open flame, so fitters and boilermakers kept working on surrounding chutes and piping without downtime

Project Overview

During a planned statutory maintenance shutdown at the South Walker Creek open-cut coal mine in the Bowen Basin, Central QLD, asset operators needed to remediate a primary CHPP sump tank. The existing 3 to 5mm polyurea lining had reached the end of its service life, with localised delamination exposing the steel to aggressive slurry abrasion and chemical attack.

Complete removal was mandatory before NDT structural inspections and relining could take place, all within a tightly constrained shutdown window.

  • Manual pneumatic chiselling, gouging and grinding pose severe Hand-Arm Vibration Syndrome (HAVS) risks and create sharp flying debris in confined plant spaces
  • Open gas torches generate toxic isocyanate fumes and carbon monoxide, triggering hot work constraints and heavy respiratory controls
  • Mechanical chipping scores and gouges the parent steel, creating stress concentrations and requiring secondary grinding
  • UHP water jetting would have generated large volumes of slurry waste, disrupted adjacent maintenance fronts and caused flash rusting
  • Principal contractor Imatech needed a rapid, non-destructive method that would not delay the shutdown or compromise worker safety

Services Included

  • RPR induction lining removal
  • Removal of 3 to 5mm elastomeric polyurea
  • Self-contained mobile RPR unit
  • Two-person specialist technician crew
  • Non-destructive, flame-free removal with no hot work permits
  • Waste capture using ground drop sheets
  • Surface preparation leaving clean steel ready for NDT and relining

Conclusion

RPR induction delivered a cleaner, safer and commercially superior outcome at South Walker Creek, returning the sump tank to Imatech well ahead of the critical shutdown path.

  • The entire 32m² internal geometry stripped in a single 10-hour shift, eliminating several days of mechanical chipping
  • Polyurea lifted away in large, pliable sheets using hand scrapers, with no cutting, burning or grinding
  • Steel left bare, unwarped and free of tool marks, with the original surface profile fully preserved
  • Inspectors could immediately carry out ultrasonic thickness testing and magnetic particle inspections
  • 100 per cent of waste captured on drop sheets, reducing clean-up and disposal handling
  • No dust, vibration or open flame, so fitters and boilermakers kept working on surrounding chutes and piping without downtime

Share:

Explore innovation, technology and news from our journey

Explore the latest innovations, project stories, and insights from the ACR Tech team.