Discover Australian Coating Removal (ACR) Tech and our innovative induction-based solutions.
Learn about our commitment to safer, smarter, and more efficient industrial coating removal.
Get in touch with our Brisbane team for project enquiries and expert advice.
Efficient surface preparation using precision induction technology for tanks, bridges, and more.
Specialised coating removal solutions for the offshore, marine, and large-scale industrial sectors.
Review real-world examples of our technology delivering results on complex infrastructure projects.
The Eurotunnel project involved the removal of an epoxy adhesive floor coating from the steel floors of railway wagons used to transport trucks through the Channel Tunnel. The work was carried out at the Euro Tunnel workshop in Coquelles, France, by PROMETA PR, an RPR 1650 operator, under a 3-year maintenance contract with Euro Tunnel.
The railway wagons were originally fitted with wooden floors bonded to the steel substrate using the Nuansol epoxy adhesive system. Heavy truck traffic through the tunnel was wearing down the timber flooring far too quickly, leading Euro Tunnel to replace the wooden floors with steel sheets. Before the new steel flooring could be installed, the residual Nuansol epoxy adhesive coating, ranging from 2 to 4mm in thickness, needed to be fully removed from the 8mm thick steel floor panels of each wagon.
The contract required PROMETA PR to process 4 wagons every 3 to 4 weeks across the 3-year programme, making throughput speed and operational consistency critical to the viability of the contract. The initial challenge was finding a removal method that could meet these demands:
The requirement was clear: full removal of the Nuansol epoxy adhesive to a standard that would allow a new coating to be applied directly over the cleaned steel surface, while preserving as much of the original surface roughness as possible to assist with the adhesion of the new system.
RPR Technologies delivered a complete epoxy adhesive floor coating removal service for the Eurotunnel railway wagon refurbishment programme at the Coquelles workshop, operated by PROMETA PR under a 3-year maintenance contract with Euro Tunnel.
Equipment deployed:
Removal process:
Outcomes achieved:
The Eurotunnel railway wagon project is one of the clearest demonstrations of RPR heat induction technology transforming a previously impractical maintenance contract into a fast, clean, and commercially viable programme. The results achieved by PROMETA PR at the Coquelles workshop over the 3-year contract speak for themselves:
Where sand blasting had made the contract throughput requirement completely impractical, RPR delivered a repeatable and high-throughput solution that met Euro Tunnel’s programme demands reliably across 3 years of ongoing wagon refurbishment works.
Beyond the speed advantage, the RPR process fundamentally changed the working environment at the Coquelles workshop. The elimination of spent grit, airborne dust, and the associated clean-up burden between jobs made the programme far safer and more operationally manageable for the PROMETA PR team on a day-to-day basis.
For rail and transport operators managing ongoing rolling stock maintenance programmes that involve adhesive or epoxy coating removal in workshop environments, the Eurotunnel project demonstrates that RPR induction technology can deliver dramatic throughput improvements, a safer working environment, and the operational consistency needed to make long-term maintenance contracts genuinely viable.
The Eurotunnel project involved the removal of an epoxy adhesive floor coating from the steel floors of railway wagons used to transport trucks through the Channel Tunnel. The work was carried out at the Euro Tunnel workshop in Coquelles, France, by PROMETA PR, an RPR 1650 operator, under a 3-year maintenance contract with Euro Tunnel.
The railway wagons were originally fitted with wooden floors bonded to the steel substrate using the Nuansol epoxy adhesive system. Heavy truck traffic through the tunnel was wearing down the timber flooring far too quickly, leading Euro Tunnel to replace the wooden floors with steel sheets. Before the new steel flooring could be installed, the residual Nuansol epoxy adhesive coating, ranging from 2 to 4mm in thickness, needed to be fully removed from the 8mm thick steel floor panels of each wagon.
The contract required PROMETA PR to process 4 wagons every 3 to 4 weeks across the 3-year programme, making throughput speed and operational consistency critical to the viability of the contract. The initial challenge was finding a removal method that could meet these demands:
The requirement was clear: full removal of the Nuansol epoxy adhesive to a standard that would allow a new coating to be applied directly over the cleaned steel surface, while preserving as much of the original surface roughness as possible to assist with the adhesion of the new system.
RPR Technologies delivered a complete epoxy adhesive floor coating removal service for the Eurotunnel railway wagon refurbishment programme at the Coquelles workshop, operated by PROMETA PR under a 3-year maintenance contract with Euro Tunnel.
Equipment deployed:
Removal process:
Outcomes achieved:
The Eurotunnel railway wagon project is one of the clearest demonstrations of RPR heat induction technology transforming a previously impractical maintenance contract into a fast, clean, and commercially viable programme. The results achieved by PROMETA PR at the Coquelles workshop over the 3-year contract speak for themselves:
Where sand blasting had made the contract throughput requirement completely impractical, RPR delivered a repeatable and high-throughput solution that met Euro Tunnel’s programme demands reliably across 3 years of ongoing wagon refurbishment works.
Beyond the speed advantage, the RPR process fundamentally changed the working environment at the Coquelles workshop. The elimination of spent grit, airborne dust, and the associated clean-up burden between jobs made the programme far safer and more operationally manageable for the PROMETA PR team on a day-to-day basis.
For rail and transport operators managing ongoing rolling stock maintenance programmes that involve adhesive or epoxy coating removal in workshop environments, the Eurotunnel project demonstrates that RPR induction technology can deliver dramatic throughput improvements, a safer working environment, and the operational consistency needed to make long-term maintenance contracts genuinely viable.
Share:
Explore the latest innovations, project stories, and insights from the ACR Tech team.
October 28, 2026
Planning a Blast and Paint Project in Queensland: How Induction Coating Removal Cuts Blast Time and Waste
October 26, 2026
Induction Coating Removal Costs in Australia: What Drives the Price per Square Metre on Steel Assets
September 28, 2026
Planning a Lead Paint Removal Project in Australia: Compliance, Licensing and Site Setup
September 21, 2026
Hazardous Coating Removal Costs: Why Waste Volume Drives the Budget
August 5, 2026
How to Remove Industrial Coatings from Steel: A Complete Guide
May 26, 2026
Reimagining Asset Remediation with Next-Generation Coating Removal