Discover Australian Coating Removal (ACR) Tech and our innovative induction-based solutions.
Learn about our commitment to safer, smarter, and more efficient industrial coating removal.
Get in touch with our Brisbane team for project enquiries and expert advice.
Efficient surface preparation using precision induction technology for tanks, bridges, and more.
Specialised coating removal solutions for the offshore, marine, and large-scale industrial sectors.
Review real-world examples of our technology delivering results on complex infrastructure projects.
The Troll A platform is one of the largest and most technically complex offshore structures in the world, located in the Norwegian offshore sector and operated by Statoil ASA. Standing in approximately 303 metres of water, Troll A is a concrete gravity-based structure that plays a central role in Norwegian gas production. Like all offshore platforms of its age, Troll A requires ongoing maintenance and periodic modification works to extend its operational life and meet current safety and regulatory standards.
In 2009-2010, a major modification project was undertaken on the platform’s living quarters module. Before a new living quarters module could be installed, the existing structural walls needed to be prepared for cutting and welding. This required the full removal of all coating systems on those walls, including:
The Chartek had been applied at a thickness of 20mm over a carbon mesh reinforcement on steel substrates ranging from 12 to 16mm in thickness. Removing this material completely and efficiently, in an occupied living quarters environment where noise and vibration could not be tolerated around the clock, was the central challenge facing maintenance contractor Norisol AS and their project management team. Conventional chiselling and grinding were restricted to a maximum of 6 hours per day due to crew rest requirements, making the overall programme duration far longer than the project schedule could accommodate.
RPR Technologies delivered a full Chartek intumescent fireproofing removal service on the Troll A platform’s living quarters module, working in close coordination with Norisol AS and Norspray AS to meet the structural preparation requirements for the new module installation.
Equipment deployed:
Removal process:
Operational outcomes:
The Statoil Troll A project demonstrates the unique capability of RPR Induction technology in occupied, noise-sensitive offshore environments where conventional removal methods simply cannot operate effectively. The results speak for themselves:
This shift from a noise-restricted 6-hour daily window to continuous around-the-clock operations had a transformative effect on the project programme, significantly compressing the overall duration and keeping the modification schedule on track.
Beyond the programme benefits, the RPR process delivered a technically superior outcome for substrate preparation. The ability to work without exclusion zones, without abrasive waste, and without disrupting the occupied living quarters made RPR the only viable solution for this scope of work in this environment.
For offshore operators managing structural modification or maintenance programmes on occupied platforms, the Troll A project sets a strong benchmark for what RPR induction-based coating removal can achieve in the most demanding and sensitive working environments. Where noise, vibration, and crew welfare constraints make conventional methods impractical, RPR delivers a faster, safer, and fully unrestricted alternative.
The Troll A platform is one of the largest and most technically complex offshore structures in the world, located in the Norwegian offshore sector and operated by Statoil ASA. Standing in approximately 303 metres of water, Troll A is a concrete gravity-based structure that plays a central role in Norwegian gas production. Like all offshore platforms of its age, Troll A requires ongoing maintenance and periodic modification works to extend its operational life and meet current safety and regulatory standards.
In 2009-2010, a major modification project was undertaken on the platform’s living quarters module. Before a new living quarters module could be installed, the existing structural walls needed to be prepared for cutting and welding. This required the full removal of all coating systems on those walls, including:
The Chartek had been applied at a thickness of 20mm over a carbon mesh reinforcement on steel substrates ranging from 12 to 16mm in thickness. Removing this material completely and efficiently, in an occupied living quarters environment where noise and vibration could not be tolerated around the clock, was the central challenge facing maintenance contractor Norisol AS and their project management team. Conventional chiselling and grinding were restricted to a maximum of 6 hours per day due to crew rest requirements, making the overall programme duration far longer than the project schedule could accommodate.
RPR Technologies delivered a full Chartek intumescent fireproofing removal service on the Troll A platform’s living quarters module, working in close coordination with Norisol AS and Norspray AS to meet the structural preparation requirements for the new module installation.
Equipment deployed:
Removal process:
Operational outcomes:
The Statoil Troll A project demonstrates the unique capability of RPR Induction technology in occupied, noise-sensitive offshore environments where conventional removal methods simply cannot operate effectively. The results speak for themselves:
This shift from a noise-restricted 6-hour daily window to continuous around-the-clock operations had a transformative effect on the project programme, significantly compressing the overall duration and keeping the modification schedule on track.
Beyond the programme benefits, the RPR process delivered a technically superior outcome for substrate preparation. The ability to work without exclusion zones, without abrasive waste, and without disrupting the occupied living quarters made RPR the only viable solution for this scope of work in this environment.
For offshore operators managing structural modification or maintenance programmes on occupied platforms, the Troll A project sets a strong benchmark for what RPR induction-based coating removal can achieve in the most demanding and sensitive working environments. Where noise, vibration, and crew welfare constraints make conventional methods impractical, RPR delivers a faster, safer, and fully unrestricted alternative.
Share:
Explore the latest innovations, project stories, and insights from the ACR Tech team.
October 28, 2026
Planning a Blast and Paint Project in Queensland: How Induction Coating Removal Cuts Blast Time and Waste
October 26, 2026
Induction Coating Removal Costs in Australia: What Drives the Price per Square Metre on Steel Assets
September 28, 2026
Planning a Lead Paint Removal Project in Australia: Compliance, Licensing and Site Setup
September 21, 2026
Hazardous Coating Removal Costs: Why Waste Volume Drives the Budget
August 5, 2026
How to Remove Industrial Coatings from Steel: A Complete Guide
May 26, 2026
Reimagining Asset Remediation with Next-Generation Coating Removal