Discover Australian Coating Removal (ACR) Tech and our innovative induction-based solutions.
Learn about our commitment to safer, smarter, and more efficient industrial coating removal.
Get in touch with our Brisbane team for project enquiries and expert advice.
Efficient surface preparation using precision induction technology for tanks, bridges, and more.
Specialised coating removal solutions for the offshore, marine, and large-scale industrial sectors.
Review real-world examples of our technology delivering results on complex infrastructure projects.
Mobile RPR induction system disbonded the lead coating in solid, non-respirable sheets with zero airborne dust.
Boom lifts replaced full-height scaffold encapsulation, saving weeks of setup and hundreds of thousands in access hire.
The BP Kwinana Energy Hub in Western Australia is a critical piece of national fuel infrastructure, handling large volumes of liquid hydrocarbons under strict safety and environmental protocols. As part of an ongoing asset integrity and corrosion prevention campaign, BP scheduled Tank 303, a large vertical cylindrical bulk storage tank, for complete external coating removal and recoating.
Testing confirmed the legacy coating contained high concentrations of lead-based compounds, making removal in a live refinery environment extremely high risk.
RPR induction delivered major safety and cost advantages for BP Kwinana, proving that lead paint can be stripped from live fuel storage tanks without scaffolding, dust or abrasive media.
The BP Kwinana Energy Hub in Western Australia is a critical piece of national fuel infrastructure, handling large volumes of liquid hydrocarbons under strict safety and environmental protocols. As part of an ongoing asset integrity and corrosion prevention campaign, BP scheduled Tank 303, a large vertical cylindrical bulk storage tank, for complete external coating removal and recoating.
Testing confirmed the legacy coating contained high concentrations of lead-based compounds, making removal in a live refinery environment extremely high risk.
RPR induction delivered major safety and cost advantages for BP Kwinana, proving that lead paint can be stripped from live fuel storage tanks without scaffolding, dust or abrasive media.
Share:
Explore the latest innovations, project stories, and insights from the ACR Tech team.
October 28, 2026
Planning a Blast and Paint Project in Queensland: How Induction Coating Removal Cuts Blast Time and Waste
October 26, 2026
Induction Coating Removal Costs in Australia: What Drives the Price per Square Metre on Steel Assets
September 28, 2026
Planning a Lead Paint Removal Project in Australia: Compliance, Licensing and Site Setup
September 21, 2026
Hazardous Coating Removal Costs: Why Waste Volume Drives the Budget
August 5, 2026
How to Remove Industrial Coatings from Steel: A Complete Guide
May 26, 2026
Reimagining Asset Remediation with Next-Generation Coating Removal