Induction Coating Removal – Wakato Bridge (Japan)

Project Overview

This project involved the large-scale removal of hazardous coatings from a major bridge structure in Japan using RPR Induction technology. The scope covered 5,000 m2 of bridge structure containing thick, hazardous coatings in a harsh marine environment. RPR Induction technology was selected for its ability to remove coatings to a depth exceeding 1,000 microns without the use of any abrasive materials, while enabling simultaneous multi-trade operations without disrupting live traffic. The project was completed as part of an accelerated program, demonstrating the efficiency and safety advantages of RPR’s induction-based approach in complex, high-risk environments.

Services Included

  • Induction coating removal across 5,000 m2 of bridge structure
  • Removal of hazardous coatings containing dangerous substances
  • Abrasive-free coating removal with greater than 1,000 microns removed
  • Simultaneous multi-trade operations with reduced encapsulation requirements
  • Full project delivery with no traffic interruption
  • Accelerated program delivery in a harsh marine environment

Conclusion

The Wakato Bridge project in Japan stands as a strong example of RPR Induction technology’s capability in large-scale, high-risk marine environments. Achieving full coating removal across 5,000 m2 of bridge structure, with more than 1,000 microns removed and absolutely no abrasive used, the project was completed without interrupting traffic flow at any point. This outcome highlights RPR’s ability to deliver safe, efficient, and environmentally responsible coating removal solutions on complex infrastructure projects. To date, RPR Technologies has completed 23 bridge projects in Japan, reinforcing its position as a trusted partner for induction-based coating removal across the region.

Project Overview

2026

This project involved the large-scale removal of hazardous coatings from a major bridge structure in Japan using RPR Induction technology. The scope covered 5,000 m2 of bridge structure containing thick, hazardous coatings in a harsh marine environment. RPR Induction technology was selected for its ability to remove coatings to a depth exceeding 1,000 microns without the use of any abrasive materials, while enabling simultaneous multi-trade operations without disrupting live traffic. The project was completed as part of an accelerated program, demonstrating the efficiency and safety advantages of RPR’s induction-based approach in complex, high-risk environments.

Services Included

  • Induction coating removal across 5,000 m2 of bridge structure
  • Removal of hazardous coatings containing dangerous substances
  • Abrasive-free coating removal with greater than 1,000 microns removed
  • Simultaneous multi-trade operations with reduced encapsulation requirements
  • Full project delivery with no traffic interruption
  • Accelerated program delivery in a harsh marine environment

Conclusion

The Wakato Bridge project in Japan stands as a strong example of RPR Induction technology’s capability in large-scale, high-risk marine environments. Achieving full coating removal across 5,000 m2 of bridge structure, with more than 1,000 microns removed and absolutely no abrasive used, the project was completed without interrupting traffic flow at any point. This outcome highlights RPR’s ability to deliver safe, efficient, and environmentally responsible coating removal solutions on complex infrastructure projects. To date, RPR Technologies has completed 23 bridge projects in Japan, reinforcing its position as a trusted partner for induction-based coating removal across the region.