Discover Australian Coating Removal (ACR) Tech and our innovative induction-based solutions.
Learn about our commitment to safer, smarter, and more efficient industrial coating removal.
Get in touch with our Brisbane team for project enquiries and expert advice.
Efficient surface preparation using precision induction technology for tanks, bridges, and more.
Specialised coating removal solutions for the offshore, marine, and large-scale industrial sectors.
Review real-world examples of our technology delivering results on complex infrastructure projects.
The Savage River pipeline was constructed in the late 1960s and is one of the world’s longest suspended pipelines, built to transport iron ore slurry across a valley at the northern end of the mine. The pipeline had been coated with a lead-based paint which had remained in place until this project. Working with Duratec, the ACR team developed a plan to remove the coating in the safest and most efficient way possible without conventional coating removal methods. Due to the pipeline being suspended 200m across a valley with national park and protected areas below, conventional methods were out of the question as it would have been extremely difficult to contain any dust or falling material. ACR’s heat induction technology was the solution, using a hanging basket engineered to connect directly to the pipeline and lined with plastic sheeting to collect and contain all material removed, which was then disposed of in accordance with health and safety procedures.
The project ran in 2 stages. The southern side was completed first over a 4 week period in early 2022, with the team returning in May 2023 to complete the northern side. A 2-stage coating removal process was used. Firstly, the top layer of coating was removed using induction heating, removing 95% of the lead coating with some residue remaining. The current was then lowered to remove the remaining 5%, leaving a clean surface to work from.
This project was a complete success. Had Duratec used traditional coating removal methods, it would have been extremely difficult to contain the dust created from blasting this toxic coating. Using ACR’s induction heating technology, the team successfully completed the project safely and on time with no incidents, which is always the main focus at ACR. Moving forward, Duratec will proceed to use mechanical aids (MBX) to clean and profile the pipeline before applying a new coating.
01 Feb 2022 – 19th May 2023
The Savage River pipeline was constructed in the late 1960s and is one of the world’s longest suspended pipelines, built to transport iron ore slurry across a valley at the northern end of the mine. The pipeline had been coated with a lead-based paint which had remained in place until this project. Working with Duratec, the ACR team developed a plan to remove the coating in the safest and most efficient way possible without conventional coating removal methods. Due to the pipeline being suspended 200m across a valley with national park and protected areas below, conventional methods were out of the question as it would have been extremely difficult to contain any dust or falling material. ACR’s heat induction technology was the solution, using a hanging basket engineered to connect directly to the pipeline and lined with plastic sheeting to collect and contain all material removed, which was then disposed of in accordance with health and safety procedures.
The project ran in 2 stages. The southern side was completed first over a 4 week period in early 2022, with the team returning in May 2023 to complete the northern side. A 2-stage coating removal process was used. Firstly, the top layer of coating was removed using induction heating, removing 95% of the lead coating with some residue remaining. The current was then lowered to remove the remaining 5%, leaving a clean surface to work from.
This project was a complete success. Had Duratec used traditional coating removal methods, it would have been extremely difficult to contain the dust created from blasting this toxic coating. Using ACR’s induction heating technology, the team successfully completed the project safely and on time with no incidents, which is always the main focus at ACR. Moving forward, Duratec will proceed to use mechanical aids (MBX) to clean and profile the pipeline before applying a new coating.
Share:
Explore the latest innovations, project stories, and insights from the ACR Tech team.
October 28, 2026
Planning a Blast and Paint Project in Queensland: How Induction Coating Removal Cuts Blast Time and Waste
October 26, 2026
Induction Coating Removal Costs in Australia: What Drives the Price per Square Metre on Steel Assets
September 28, 2026
Planning a Lead Paint Removal Project in Australia: Compliance, Licensing and Site Setup
September 21, 2026
Hazardous Coating Removal Costs: Why Waste Volume Drives the Budget
August 5, 2026
How to Remove Industrial Coatings from Steel: A Complete Guide
May 26, 2026
Reimagining Asset Remediation with Next-Generation Coating Removal