Discover Australian Coating Removal (ACR) Tech and our innovative induction-based solutions.
Learn about our commitment to safer, smarter, and more efficient industrial coating removal.
Get in touch with our Brisbane team for project enquiries and expert advice.
Efficient surface preparation using precision induction technology for tanks, bridges, and more.
Specialised coating removal solutions for the offshore, marine, and large-scale industrial sectors.
Review real-world examples of our technology delivering results on complex infrastructure projects.
Coating Removal on Storage Tanks – The RPR Induction System enables fast and efficient removal of coatings from large storage tank surfaces and facilitates weld seam inspection and bulk coating removal. Experience from tank applications shows that thick glass-fiber coatings (5–6 mm) can be removed at stripping rates of 10–12 m²/hr or more, supporting rapid inspection and remediation. In addition to high stripping efficiency, the process delivers strong economic benefits through minimal waste generation and a safer, cleaner, and more environmentally friendly working environment for operators.
HIGHER REMOVAL RATES
Engineered with various induction heads for challenging geometry steel sections, rivets encountered on many Steel bridge structures
MINIMISED WASTE DISPOSAL
No grit or water media added, eliminating the need for transport and disposal.
SIMULTANEOUS OPERATIONS (SIMOPS)
75% less energy consumption with zero grit or water deposits left behind.
ENVIRONMENT
Safe, quiet, and low-dust operation with minimal protective gear required.
OPERATOR FRIENDLY
Low-noise, low-dust process lets other trades work safely in parallel, reducing asset outage time.














“With the use of IPR the existing protective coatings are removed in sheets and is easily collected and dispose of appropriately without any loss to the environment. The IPR method has been found to be safer for workers and the environment while increasing the efficiency of the task.”
Project Superintendent // Gladstone Port Corporation
Explore the latest innovations, project stories, and insights from the ACR Tech team.
October 28, 2026
Planning a Blast and Paint Project in Queensland: How Induction Coating Removal Cuts Blast Time and Waste
October 26, 2026
Induction Coating Removal Costs in Australia: What Drives the Price per Square Metre on Steel Assets
September 28, 2026
Planning a Lead Paint Removal Project in Australia: Compliance, Licensing and Site Setup
September 21, 2026
Hazardous Coating Removal Costs: Why Waste Volume Drives the Budget
August 5, 2026
How to Remove Industrial Coatings from Steel: A Complete Guide
May 26, 2026
Reimagining Asset Remediation with Next-Generation Coating Removal