Building

Induction coating removal for structural steel in commercial, industrial, and government buildings — faster and cleaner than abrasive blasting, with no secondary waste and no damage to the substrate.

From concept to completion

0 +

Leading years
in business

0 +

Projects completed
nationwide

Overview

ACR delivers induction-based coating removal on structural steel elements across building refurbishment, remediation, and asset maintenance projects. Our service is suited to occupied or sensitive environments where traditional blasting methods create unacceptable dust, noise, or contamination risks.

From aged epoxies and lead-based paints to thick industrial coatings, ACR removes what needs to go — cleanly, efficiently, and without compromising the steel beneath.

Services Included

  • Coating removal from structural beams, columns, frames, and connections
  • Safe handling of lead-based and hazardous paint systems — no airborne particulate risk
  • No grit blasting media or water waste — coatings release intact for easy collection and disposal
  • Suitable for occupied buildings, heritage structures, and environmentally sensitive sites
  • Prepares steel surfaces for recoating, inspection, or structural assessment
  • Compliant with asset owner and government project requirements

Pipeline

Live Pipeline Approved. No Shutdown Required.

Coating removal doesn’t have to mean taking assets offline. ACR Tech’s induction process is effective on pipes and live pipeline projects — and with patented safety features, our systems are approved for use even on live oil and gas pipelines.
We efficiently remove coal tar, ebonite, rubber, and 3LPE/3LPP coatings up to 25mm thick — with zero airborne dust, no blast media, and no secondary waste to manage.


When downtime costs more than the project itself, we’re the call you make first.

Building

Live Pipeline Approved. No Shutdown Required.

Coating removal doesn’t have to mean taking assets offline. ACR Tech’s induction process is effective on pipes and live pipeline projects — and with patented safety features, our systems are approved for use even on live oil and gas pipelines.
We efficiently remove coal tar, ebonite, rubber, and 3LPE/3LPP coatings up to 25mm thick — with zero airborne dust, no blast media, and no secondary waste to manage.


 

When downtime costs more than the project itself, we’re the call you make first.

Marine

Live Pipeline Approved. No Shutdown Required.

Coating removal doesn’t have to mean taking assets offline. ACR Tech’s induction process is effective on pipes and live pipeline projects — and with patented safety features, our systems are approved for use even on live oil and gas pipelines.
We efficiently remove coal tar, ebonite, rubber, and 3LPE/3LPP coatings up to 25mm thick — with zero airborne dust, no blast media, and no secondary waste to manage.


 

When downtime costs more than the project itself, we’re the call you make first.

Tanks

Live Pipeline Approved. No Shutdown Required.

Coating removal doesn’t have to mean taking assets offline. ACR Tech’s induction process is effective on pipes and live pipeline projects — and with patented safety features, our systems are approved for use even on live oil and gas pipelines.
We efficiently remove coal tar, ebonite, rubber, and 3LPE/3LPP coatings up to 25mm thick — with zero airborne dust, no blast media, and no secondary waste to manage.


 

When downtime costs more than the project itself, we’re the call you make first.

Bridges

Live Pipeline Approved. No Shutdown Required.

Coating removal doesn’t have to mean taking assets offline. ACR Tech’s induction process is effective on pipes and live pipeline projects — and with patented safety features, our systems are approved for use even on live oil and gas pipelines.
We efficiently remove coal tar, ebonite, rubber, and 3LPE/3LPP coatings up to 25mm thick — with zero airborne dust, no blast media, and no secondary waste to manage.


 

When downtime costs more than the project itself, we’re the call you make first.

Offshore

Live Pipeline Approved. No Shutdown Required.

Coating removal doesn’t have to mean taking assets offline. ACR Tech’s induction process is effective on pipes and live pipeline projects — and with patented safety features, our systems are approved for use even on live oil and gas pipelines.
We efficiently remove coal tar, ebonite, rubber, and 3LPE/3LPP coatings up to 25mm thick — with zero airborne dust, no blast media, and no secondary waste to manage.


 

When downtime costs more than the project itself, we’re the call you make first.

Hazardous Coatings

No Grit. No Dust. No Disruption.

ACR removes hazardous coatings including lead-based paints, Chartek fireproofing, and thick epoxy systems from live industrial assets. No grit blasting, no water discharge, and no shutdown required. Adjacent trades work safely throughout.